The Contract for Road Infrastructures and Pavements - Street C - Allotment of the Alcântara Execution Unit (Zone 3), in Lisbon, has a total value of € 630.000,00 and an estimated execution period of 6 months.
The contract includes the intervention on Street C that will connect Avenue of India to the existing roads: Street Maria Luisa Holstein and Street Maria Isabel Saint-Leger, extending for 114 meters, in a north-south direction. The carriageway will be 10,4 meters wide, with a minimum sidewalk width of 3 meters. This intervention also includes the execution of road infrastructure (paving and signaling), and the execution of sanitation infrastructure (rainwater drainage and domestic residual drainage).